| |
Phase
1:
Develop An Existing Issue List
Analyze and determine the
issues that need to be addressed. Prioritize from high to low with
regard to importance.
Phase
2:
Data Gathering
Gather the necessary data
to verify current conditions and develop plans and solutions based on
facts.
Phase
3:
Strategic Planning
Optional plans are
developed with regard to need, return on investment, financial ability.
Phase
4:
Software Assessment
Analyze existing software
to determine interface issues.
Phase
5:
Final Design
Optimal design is chosen
and used to generate specifications, solicit bids and select equipment.
Phase
6:
System Move
If applicable, generate a
plan that details the system move. This is often overlooked but essential
to a successful implementation.
Phase
7:
Implementation
Develop a master plan to
bring a system on-line while keeping operations on going. |
Whenspaceissotightthat
everythingbeginstoruntogether youreallycan'tmakesenseof anything.
DCI Has Helped Many Organizations Grow
Into Their Dreams. By Taking An Active Role In The Long Range
Plan Of Each Of Its Customers, DCI Is Able To Upgrade Equipment And
Monitor Systems To Make An Organization's Growing Pains Not Quite So
Painful. |